CGs-4E Gas-Fired Water Boiler — Boiler Manual
Place boiler/crate near
position
1. Leave boiler in crate and on pallet until installation
site is ready.
2. Moveentirecrateandpalletnexttoselectedloca-
tion.
3. Remove crate.
4. Remove boiler from pallet.
Donotdropboilerorbumpjacket
onoororpallet.Damagetoboiler
can result.
a. Tilt left side of boiler up and place a board
under left legs.
b. Tilt boiler the other way and place a board
under right legs.
c. Slideboilerbackwardoffpalletandintoposi-
tion.
5. Checklevel.
a. Shimlegs,ifnecessary.
b. Donotalterlegs.
Prepare boiler — placement & setup2a
Table 2 Manifold orifice sizing
Location Natural gas Propane gas
U. S.
0-2,000 ft over 2,000 ft 0-2,000 ft over 2,000 ft
2.55 mm (Note 1) 1.60 mm (Note 1)
Canada
0-2,000 ft 2,000-4,500 0-2,000 ft 2,000-4,500
2.55 mm #41 1.60 mm 1.45 mm
Note 1:
For elevations above 2,000 feet, contact your local Weil-McLain sales office for details.
Inspect orifices and burners
1. Remove front jacket door. Remove inlet air box top
panel (see Figure 27, item 13, page 56).
2. Check for correctly-sized manifold orices. See
Table 2 for sizing. (The orifice size is stamped on
the orifice spud barrel.)
Correctly-sized manifold orifices
must be used. Failure to do so will
result in severe personal injury,
death or substantial property dam-
age.
3. Reinstall inlet air box top panel.
Orifice replacement procedure
(when required)
1. Remove the screws securing the inlet air box top
panel.
2. Remove inlet air box top panel and inspect the fiber
gasket.Verifythegasketisingoodconditionandcan
seal around the complete perimeter of the air box.
Replace the gasket if necessary.
3. Using a
7
/
16
open-endwrench,removetheburner
orifices from the manifold.
4. Applyasmallamountofpipedopetoeachofthe
new orifices and install in the manifold using a
7
/
16
”
open-endwrench.Makesuretheoricesarealigned
correctly, not cross-threaded in the manifold tap-
pings.
Use only pipe dope compatible with
propane gas, even if boiler is to be
operated on natural gas. Failure to
comply could result in severe per-
sonal injury, death or substantial
property damage.
5. Carefullyreplacetheinletairboxtoppanel,making
sure the gasket is in place will seal all around the
perimeter.
6. Followthecheck-outprocedure,Section8 page 31,
to assure the boiler is now operating properly after
orifices are replaced.
Inlet air box top panel must be in
position during boiler operation.
Failure to do so could result in
severe personal injury, death or
substantial property damage.